Tapan Sharma currently serves as the Vice President with McLarens India. With over 15 years of expertise in loss assessment and adjustments across Property, Construction & Engineering, Miscellaneous, and Marine claims, he has successfully managed cases ranging from standard fire and allied perils involving industries, warehouses, shops, and malls, to complex construction losses under Contractor’s All Risk (CAR) and Erection All Risk (EAR) policies, as well as machinery breakdown losses under engineering policies.
He has a proven track record in catastrophic loss management, having led multiple large-scale assignments involving natural disasters and industrial incidents, often requiring rapid mobilization, technical expertise, and multi-stakeholder coordination.
NOTABLE ASSIGNMENTS
- 2023 – Led Maheshwar, Madhya Pradesh Flood
- 2020 – Led Amphan Cyclone claim settlement, West Bengal
- 2019 – Storm damage to transmission tower & Business Interruption Loss (USD 240K)
- 2018 – Soda Ash Project, Fire (USD 606K)
- 2017 – Flood damage at plastic extrusion machinery manufacturing unit (USD 1.2 Million)
- 2017 – Flood damage in pharmaceutical plant – USD (USD 600K)
- 2017 – Hydraulic drilling rig breakdown (USD 112K)
- 2015 – Pharmaceutical warehouse fire (USD 148K)
- 2014 – Pharmaceutical plant fire (USD 196K)
- 2011 – Damage to catalyst (USD 254K)